摘要(Abstract):
基于PSCAD搭建了内蒙古电网水电黑启动试验系统模型,对黑启动试验的发电机空充线路、长线路空充主变压器、火电厂大功率辅机启动、火电机组并网等过程进行了潮流和动态仿真,基于仿真结果对发电机自励磁、空充线路合闸过电压、空充主变压器铁磁谐振过电压、启动负荷引起的系统电压和频率波动等情况进行了分析。认为万家寨水电站3号机组以孤网模式运行,在低负荷工况下能够维持试验系统频率稳定,并具有较强的进相能力,可作为内蒙古电网黑启动电源;黑启动过程中机组未出现自励磁现象,各厂站母线电压未超过规定限值,建议火电机组取消初负荷,以免并网后造成系统频率大幅波动。
Based on PSCAD, the hydropower black start test system model of Inner Mongolia power grid is built. The power flow and dynamic simulation are carried out for the processes of generator charging idle-load line, long line charging idleload transformer, high-power motor startup of thermal power plant and grid connection of thermal power units. Based on the simulation results, the generator self-excitation, switching over-voltage of charging idle-load line, ferroresonance overvoltage of charging idle-load transformer, system voltage and frequency fluctuations caused by starting load are analyzed. Finally, it is concluded that unit 3 of Wanjiazhai Hydropower Station is operating in isolated network mode, which can maintain the frequency stability of the test system under low load conditions, and has strong under-excitation capacity, which can be used as the black start power supply of Inner Mongolia power grid. During black start, self excitation hasn′t happened in the unit, and the bus voltage of each station can not exceed the specified limit. The initial load of thermal power unit shall be cancelled to avoid large fluctuation of system frequency after grid connection.
关键词(KeyWords):
黑启动;仿真;PSCAD;过电压;频率;辅机
black start;simulation;PSCAD;overvoltage;frequency;auxiliary machine
基金项目(Foundation): 内蒙古电力(集团)有限责任公司科技项目“内蒙古电网黑启动方案研究及系统试验”(2016-01-40)
作者(Author):
邢华栋,原帅,陶军,焦晓峰,张谦,贾斌,朱生华
XING Huadong,YUAN Shuai,TAO Jun,JIAO Xiaofeng,ZHANG Qian,JIA Bin,ZHU Shenghua
参考文献(References):
- [1]王小海,王春生,万江,等.内蒙古西部电网黑启动试验[J].内蒙古电力技术,2005,23(1):1-4,8.WANG Xiaohai, WANG Chunsheng, WAN Jiang, et al.Black start-up test of western electric power grid in Inner Mongolia[J]. Inner Mongolia Electric Power, 2005,23(1):1-4, 8.
- [2]刘昭睿,王树一,张爱军,等.内蒙古电网黑启动方案仿真试验分析[J].内蒙古电力技术,2010,28(6):1-3,8.LIU Zhaorui, WANG Shuyi, ZHANG Aijun, et al. Simulation testing analysis to black start schemes of Inner Mongolia Power Grid[J]. Inner Mongolia Electric Power,2010, 28(6):1-3, 8.
- [3]刘昭睿,郭厚静,徐日娥.内蒙古500 kV电网黑启动方案分析[J].内蒙古电力技术,2011,29(2):1-3.LIU Zhaorui, GUO Houjing, XU Rie. Analysis to black start schemes of Inner Mongolia 500 kV power grid[J]. Inner Mongolia Electric Power, 2011, 29(2):1-3.
- [4]李军徽,孔明,穆钢,等.电力系统黑启动关键技术研究综述[J].南方电网技术,2017,11(5):68-77.LI Junhui, KONG Ming, MU Gang, et al. Overview of re search on key technologies of power system blackstart[J]. Southern Power System Technology, 2017, 11(5):68-77.
- [5]武海燕,张爱军,邢华栋,等.基于不同电源类型的内蒙古电网黑启动方案制订及仿真分析[J].内蒙古电力技术,2021,39(4):1-7.WU Haiyan, ZhANG Aijun, XING Huadong, et al. Formulation and simulation analysis on black start schemes of Inner Mongolia power grid based on different power sources[J]. Inner Mongolia Electric Power,2021, 39(4):1-7.
- [6]全国电网运行与控制标准化技术委员会.电网运行准则:GB/T 31464—2015[S].北京:中国质量标准出版传媒有限公司,2015.National Technical Committee on Power Grid Operation and Control of Standardization Administration of China.The grid operation code:GB/T 31464—2015[S]. Beijing:China Quality and Standards Publishing&Media Co.,Ltd., 2015.
- [7]电力行业电力电容器标准化技术委员会.电力系统电压和无功电力技术导则:DL/T 1773—2017[S].北京:中国电力出版社,2019.Technical Committee on Power Capacitors of Standardization Administration for Electric Power Industry. Technical guide for electric power system voltage and reactive compensation:DL/T 1773—2017[S]. Beijing:China Electric Power Press, 2019.
- [8]中国电力企业联合会.交流电气装置的过电压保护和绝缘配合设计规范:GB/T 50064—2014[S].北京:中国计划出版社,2014.China Power Enterprise Vocational Association. Code for design of overvoltage protection and insulation coordination for AC electrical installations:GB/T 0064—2014[S]. Beijing:China Planning Press, 2014.
- [9]叶钟海.江西电网黑启动方案研究[D].南昌:南昌大学,2018.YE Zhonghai. Research on Jiangxi power grid black start scheme[D]. Nanchang:Nanchang University, 2018.
- [10]黄弘扬,熊鸿韬,吴烨,等.浙江电网黑启动计算分析与试验研究[J].浙江电力,2018,37(1):13-18.HUANG Hongyang, XIONG Hongtao, WU Ye, et al.Computational analysis and test research on black start of Zhejiang power grid[J]. Zhejiang Electric Power, 2018, 37(1):13-18.
- [11]周剑,曾勇刚,李建设,等.南方电网黑启动系统试验[J].南方电网技术,2008,2(3),12-16,69.ZHOU Jian, ZENG Yonggang, LI Jianshe, et al. Experiments of Black Start system in China Southern power grid[J]. Southern Power System Technology,2008, 2(3), 12-16, 69.
- [12]谌军,曾勇刚,杨晋柏,等.南方电网黑启动方案[J].电力系统自动化,2006,30(9):80-83,87.ZHAN Jun, ZENG Yonggang, YANG Jinbai, et al.Black-start scheme for China Southern power grid[J].Automation of Electric Power Systems, 2006, 30(9):80-83, 87.
- [13]邢华栋,慕腾,刘会强,等.基于边界支路的电网等值方法[J].南方电网技术,2021,15(4):73-80.XING Huadong, MU Teng, LIU Huiqiang, et al.Equivalence method of power grid based on boundary branch[J]. Southern Power System Technology, 2021,15(4):73-80.
- [14]张峰峰,李晓波.黄河万家寨水利枢纽有限公司3号机组水轮机及其调节系统参数测试报告[R].呼和浩特:内蒙古电力科学研究院,2018.ZHANG Fengfeng, LI Xiaobo. Parameter test report of turbine and Its regulating system of No.3 unit of Yellow River Wanjiazhai Water Conservancy Project Co.,Ltd.[R]. Hohhot:Inner Mongolia Power Research Institute, 2018.
- [15]万雄彪,陈晶,吴水军.水电厂黑启动关键技术研究[J].云南电力技术,2021,49(5):54-57.WAN Xiongbiao, CHEN Jing, WU Shuijun. Research on key technology of black start in hydropower plant[J]. Yunnan Electric Power, 2021, 49(5):54-57.
- [16]乐健,毛涛,吴敏,等. PSCAD V4.6电路设计与仿真从入门到精通[M].北京:机械工业出版社,2019.LE Jian, MAO Tao, WU Min, et al. PSCAD V4.6 circuit design and simulation from beginner to master[M]. Beijing:China Machine Press, 2019.
- [17]汪成根,刘建坤,高小涛,等.快速切负荷火电机组参与我国黑启动服务的适应性分析[J].广东电力,2016,29(9):37-42.WANG Chenggen, LIU Jiankun, GAO Xiaotao, et al.Analysis on adaptability of FCB thermal power unit participating in black start service in China[J]. Guangdong Electric Power, 2016, 29(9):37-42.