某电厂接入特高压系统的方式探讨Discussion of Power Plants Accessing UHV Power System
郭家强,燕广鹏,马建民,王琼
Guo Jiaqiang,Yan Guangpeng,Ma Jianming,Wang Qiong
摘要(Abstract):
以大唐国际杭锦旗电厂与临近的超/特高压变电站的地理位置及鄂尔多斯地区电网网架结构等实际情况为依据,从可靠性、灵活性及经济性方面对比分析了杭锦旗电厂接入特高压系统的2种方式(一次升压方式和二次升压方式)的优劣。经综合比较,认为大唐国际杭锦旗电厂采用经二次升压后接入蒙西特高压站的方式具有更高的可靠性、灵活性及经济性,同时考虑上网电价及利用小时数等不确定因素,建议杭锦旗电厂采用二次升压方式接入蒙西特高压500kV侧。
According to the condition of location of Datang International Hangjin PowerPlant with nearby EHV/UHV substation, and power grid structure in Ordos area, the meritsand demerits of two ways for Hangjin Power Plant accessing UHV power system werecompared and analyzed. Based on the comparison, it was agreed that by adopting secondarybooster to access Inner Mongolia 500 kV power grid system is more reliable, flexible, andeconomical for Datang International Hangjin Power Plant. Besides, in consideration ofuncertain factors, such as on- grid price and utilization hours, it was suggested thatsecondary booster was the appropriate way to be adopted to access the power grid system.
关键词(KeyWords):
特高压输电;电源接入方式;一次升压;二次升压
UHV transmission;access method;first booster;secondary booster
基金项目(Foundation):
作者(Author):
郭家强,燕广鹏,马建民,王琼
Guo Jiaqiang,Yan Guangpeng,Ma Jianming,Wang Qiong
参考文献(References):
- [1]刘振亚.特高压电网[M].北京:中国经济出版社,2005:16-22.
- [2]梁旭明,张国威,徐玲玲,等.1000 kV交流特高压试验示范工程的生产准备工作与实施[J].电网技术,2008,32(5):12-16.
- [3]丁伟,胡兆光.特高压输电经济性比较研究[J].电网技术,2006,30(19):7-13.
- [4]赵良,郭强,申洪,等.特高压同步电网安全性研究[R].北京:中国电力科学研究院,2007.
- [5]内蒙古电力勘测设计院.内蒙古大唐国际杭锦旗电厂(2×1000 MW)新建工程初步可行性研究报告电气补充部分[R].呼和浩特:内蒙古电力勘测设计院,2012.
- [6]华北电力设计院.内蒙古大唐国际杭锦旗电厂(2×1000MW)新建工程勘察设计可研设计投标阶段招标文件[R].北京:华北电力设计院,2013.
- [7]内蒙古电力勘测设计院.内蒙古大唐国际杭锦旗电厂(2×1000 MW)空冷机组工程初步可行性研究报告[R].呼和浩特:内蒙古电力勘测设计院,2011.
- [8]张运洲.对我国特高压输电规划中几个问题的探讨[J].电网技术,2005,29(19):11-14.
- [9]易俊,孙华东,郭强,等.大型电源基地接入特高压输电系统方式研究[J].电网技术,2009,33(16):14-19.
- [10]赵良,郭强,宋云亭,等.发电厂接入特高压系统方式研究[J].电网技术,2011,35(3):94-97.
- [11]中国电力规划设计协会.火力发电厂设计技术规程[R].北京:水利水电出版社,1994.