10 kV架空绝缘导线断裂机理及原因分析Fracture Mechanism and Cause Analysis of 10 kV Overhead Insulated Conductor
郑建军,刘涛玮,郭心爱
ZHENG Jianjun,LIU Taowei,GUO Xin′ai
摘要(Abstract):
针对某10 kV架空绝缘导线在挂网运行后连续发生多起断线故障的问题,利用外观形貌分析、力学性能检测、显微组织观察及断口微区分析等方法对绝缘导线的断裂机理及原因进行了分析。结果表明,铝绞线与耐张线夹间的接触磨损是导致架空绝缘导线断裂的主要原因。为防止该类断裂再次发生,提出采用包裹软铝带以及在适当部位加装防振鞭和防振锤等建议。
In view of the problem that a 10 kV overhead insulated conductor is frequently cracked after short-term operation,the fracture mechanism and causes of insulated conductor are analyzed by means of appearance analysis, mechanical properties test, microstructure observation and fracture micro area analysis. The results show that the contact wear between aluminum strand and strain clamp is the main reason for the fracture of overhead insulated conductor. To prevent such fracture from recurring, this paper puts forward suggestions of using wrapping soft aluminum tape and installing anti-vibration whip or anti-vibration hammer at appropriate parts.
关键词(KeyWords):
架空绝缘导线;断裂;磨损;微风振动
overhead insulated conductor;crack;wear;aeolian vibration
基金项目(Foundation): 内蒙古电力(集团)有限责任公司科技项目“输电铁塔球头连接金具断裂机理及疲劳寿命提升关键技术研究”(2022-08)
作者(Author):
郑建军,刘涛玮,郭心爱
ZHENG Jianjun,LIU Taowei,GUO Xin′ai
参考文献(References):
- [1]文清丰,梁泽慧,王晓光,等.雷击引起220 kV架空输电线路地线断线分析[J].内蒙古电力技术,2018,36(5):82-85.WEN Qingfeng, LIANG Zehui, WANG Xiaoguang, et al. Analysis of ground wire breakage of 220 kV overhead transmission line caused by lightning strike[J]. Inner Mongolia Electric Power, 2018, 36(5):82-85.
- [2]吕晶晶,吴胜利,黄长胜,等.预防架空绝缘导线雷击断线装置的技术研发及应用[J].电力系统装备,2019(6):71-72.LYU Jingjing, WU Shengli, HUANG Changsheng, et al.Technical development and application of preventing lightning breaking device for overhead insulated wires[J]. Electric Power System Equipment, 2019(6):71-72.
- [3]王晓杰,万芯瑗,郑凌娟,等.福建近海地区配网架空绝缘导线烧蚀原因分析[J].绝缘材料,2021,54(3):78-83.WANG Xiaojie, WAN Xinyuan, ZHENG Lingjuan, et al.Analysis on ablation reason of overhead insulation line at Fujian offshore area[J]. Insulating Materials, 2021, 54(3):78-83.
- [4]王鹤超,张佳,何瑞琪,等.架空绝缘导线在10 kV配网线路建设改造中的应用技术研究[J].电工技术,2020(17):145-147.WANG Hechao, ZHANG Jia, HE Ruiqi, et al.Research on application technology of overhead insulated conductor in 10 kV distribution network construction reform[J]. Electric Engineering, 2020(17):145-147.
- [5]张涛,高云鹏,公维炜,等.配电线路10 kV架空绝缘导线频繁断线原因分析[J].内蒙古电力技术,2021,39(5):69-72.ZHANG Tao, GAO Yunpeng, GONG Weiwei, et al.Cause analysis of frequent breakage of 10 k V overhead insulated conductor of distribution lines[J]. Inner Mongolia Electric Power, 2021, 39(5):69-72.
- [6]张波,肖坤,林振,等.10 kV架空绝缘导线双向疏导式雷击断线防护装置研究[J].电工电气,2021(6):74-76.ZHANG Bo, XIAO Kun, LIN Zhen, et al. Study on the protection device of 10 kV overhead insulated conductor from lightning stroke and broken line by two way dredging[J]. Electrotechnics Electric(Jiangsu Electrical Apparatus), 2021(6):74-76.
- [7]谢家伟.架空绝缘导线在配网改造工程中的使用[J].通信电源技术,2014,31(5):74-78.XIE Jiawei. Overhead insulated conductors used in the distribution network transformation project[J]. Telecom Power Technologies, 2014, 31(5):74-78.
- [8]焦夏男,聂一雄,廖辰川,等.10 kV绝缘导线雷击断线机理的研究[J].电力科学与工程,2017,33(2):49-54.JIAO Xianan, NIE Yixiong, LIAO Chenchuan. Study on mechanism of 10 kV insulated conductor breakage caused by lightning stroke[J]. Electric Power Science and Engineering, 2017, 33(2):49-54.
- [9]张涛,高云鹏,田峰,等.500 kV超高压输电线路架空地线频繁断股原因分析[J].内蒙古电力技术,2019,37(1):11-15.ZHANG Tao, GAO Yunpeng, TIAN Feng, et al. Cause Analysis of Frequent Broken Strands of Overhead Ground Wire on 500 kV Transmission Line[J]. Inner Mongolia Electric Power, 2019, 37(1):11-15.
- [11]贾国滨,王健一,高寒,等.电容器在10 kV配电线路雷电防护中的应用研究[J].电瓷避雷器,2017(2):69-73.JIA Guobin, WANG Jianyi, GAO Han, et al.Research on the application of capacitor in 10 kV distribution line lightning protection[J]. Insulators and Surge Arresters, 2017(2):69-73.
- [12]全国电线电缆标准化技术委员会.架空绞线用硬铝线:GB/T 17048—2017[S].北京:中国标准出版社,2017.
- [13]全国电线电缆标准化技术委员会.额定电压10 kV架空绝缘电缆:GB/T 14049—2008[S].北京:中国标准出版社,2008.
- [14]袁红斌.220千伏输电线路导线断裂分析[J].电子测试,2018(23):90-91.YUAN Hongbin. Fracture analysis of conductor of 220 kV transmission line[J]. Electronic Test, 2018,(23):90-91.